Use LEED AP ID+C Dumps to Obtain USGBC Certification

Category:

Comments:

Post Date:


If you're serious about obtaining the Leadership in Energy and Environmental Design (LEED) certification, practicing with USGBC LEED AP ID+C dumps questions is a must. By doing so, you'll become familiar with the exam format, identify knowledge gaps, develop time management skills, boost your confidence, and increase your chances of success. So, start practicing LEED AP ID+C exam dumps today and give yourself the best chance of passing the LEED AP ID+C exam! Test free LEED AP Interior Design + Construction (LEED AP ID+C) V4 LEED AP ID+C exam dumps below.

Page 1 of 3

1. What must a project team inventory to determine if a project has enough reused surfaces to document Materials and Resources Credit, Interior Life-Cycle Impact Reduction, Option 1. Interior Reuse?

2. What should a team focus on first to significantly improve energy performance or achieve the lowest possible operation cost?

3. Which of the following must be considered in order to meet Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management if the tenant requires 24-hour cooling in a server room?

4. Which of the following statements is correct when defining the project boundary?

5. Which of the following is required for a cooling tower and evaporative condenser in the Water Efficiency Prerequisite, Indoor Water Use Reduction?

6. To assess the feasibility of earning Location and Transportation Credit, Reduced Parking Footprint, the project team should be familiar with what local government regulation?

7. When attempting Regional Priority Credit, Regional Priority what must be provided in the documentation?

8. What percentage of occupants require individual control of thermal systems under Indoor Environmental Quality, Thermal Comfort?

9. A tenant is targeting LEED Platinum certification and has hired a LEED AP Interior Design and Construction consultant to help identify and use opportunities to achieve synergies across disciplines and building systems.

Which of the following analyses are required to be completed in the Integrated Process Worksheet to achieve an additional point?

10. A renovation project includes both a new kitchen sink and shower and an existing lavatory and water closet within the LEED project boundary.

How would the project perform the Water Efficiency Credit, Indoor Water Use Reduction calculations?


 

TAGS:

Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments

Related

Posts