Obtaining the Professional Level Certifications AACE-PSP certification can help you demonstrate your expertise in AACE solutions and advance your career in related industry. Using AACE-PSP dumps as part of your study plan can help you identify knowledge gaps, improve your exam-taking skills, provide immediate feedback, and increase your chances of passing the AACE-PSP exam. AACE AACE-PSP exam free dumps questions are available below.

Page 1 of 5

1. The BEST reason to use multiple calendars is to:

2. A driving relationship is _____________________.

3. If a cost estimate assumes that 240 hours will be expended on a given activity, and the projected crew size expected to perform that activity is 5 personnel working and 8-hour workday, what is the calculated duration for the activity?

4. Project delays are best analyzed

5. The project continues as is completes the project late and accepts the penalties imposed. Penalties imposed for late delivery could add as much as 50% to the budget.

Assignment

Draft a proper memorandum to Desmond Raybum, IS Director, explaining in your own words:

a. the current problem and potential impact(s);

b. each course of action, stating advantages and disadvantages as appropriate; c. your recommendations, properly supported.

Please be sure to include the rationale for your recommendations. Be sure to summarize your thoughts and address (To, From, Date, and Subject/Project Name) and close the memo appropriately. If you are uncomfortable with the courses of action noted, provide your own with appropriate substantiation for your position. Limit your answer to one, full typewritten page (roughly three handwritten pages).

While your email can be a detailed as you like, be sure to write sufficiently to address each element of the assignment, yet not so long that you go beyond the scope of the exercise. Take time to read the problem and consider what you want Evan to say. Good luck!

6. Which activity is drawn in the incorrect position?

Refer to the time-scaled network diagram and other information to answer the following questions. Please consider this to be the entire network.







7. Due to a testing delay, release of the product for manufacture is delayed by 5 workdays and the product manual misses its print window at the printer. If the printer is delayed by 10 workdays, what is the delay to produce release?

8. The characteristic of the precedence diagramming method that models construction projects differently than the arrow diagramming method is that it____________.

9. Activity C is a

10. The work breakdown structure is used to organize


 