Passing the CDCS certification exam can be challenging, which is why practicing with CDCS questions can greatly increase your chances of success. EXIN CDCS dumps questions help you become familiar with the exam format. The CDCS questions are designed to mimic the actual exam, which means that you'll get a feel for the types of questions you'll encounter, the difficulty level, and the time limit. All the CDCS exam dumps questions are the latest version for you to study. Test free CDCS exam questions below.

Page 1 of 2

1. You are changing the design of the fire suppression system for your computer room from a halocarbon fire suppression system into an inert-based fire suppression system. Could you use the same formula to calculate the gas content for the gas?

2. You are allowed to use a calculator for this question.

A computer room has a net volume of approximately 2,500 m³ / 88,287 ft³.

The temperature is 20 °C / 68 °F.

The required design concentration is 7%.

The S-Factor is 0.1359 (metric) / 1.885 (imperial).

Calculate the amount of gas required for this computer room based on FM200.

What is the correct weight?

3. What is the advantage or disadvantage of using MPO (Multi-fiber Push On)/pre-terminated fiber?

4. What should be considered when installing overhead data cabling?

5. A data center has its own power supply from the public utility and receives chilled water supply from

the building owner.

What needs to be taken into consideration when calculating the PUE?

6. The humidity in the computer room has changed from about 50% down to 35% Relative Humidity (RH).

What influence does this have on Electrostatic Discharge (ESD)?

7. A new network storage device in a non-standard size rack of approximately 600 kg/1,300 lbs is going to be installed in the data center.

Are new floor loading calculations required?

8. It is assumed that EMF shielding material must be installed as the EMF levels coming from the transformer room into the computer room are measured at 100mG. The transformer room is approximately 10 meters away from the computer room and is separated by a corridor. You can assume that no physical issues are present for installing shielding material at any area/location.

Where should you recommend the shielding material to be installed?

9. What mainly affects the cooling capacity of a raised floor tile?

10. A data center is located in an area where the demand for power is higher than the utility power company is able to deliver. This results in frequent power outages and, therefore, power shedding (scheduled/controlled power shutdown for areas) is frequently applied. The mains power is more than 650 hours/year not available.

What type of generators should be installed?


 