Vmware 3V0-21.21 dumps questions are an essential tool for anyone looking to pursue the VCAP-DCV Design 2021 certification. By using these 3V0-21.21 dumps questions as part of your exam preparation, you can gain a deeper understanding of the exam format, identify knowledge gaps, build confidence, get real-time feedback, and stay up-to-date with the latest trends in Advanced Design VMware vSphere 7.x. So, if you're serious about achieving 3V0-21.21 certification success, be sure to incorporate 3V0-21.21 exam dumps questions into your study plan. Test free Vmware 3V0-21.21 exam dumps below.

Page 1 of 3

1. An architect is designing an environment for a retail customer. The design will use a single small vCenter Server Appliance and a cluster of eight ESXi hosts at a remote site. There is a single 10 GbE connected network at the remote site to support all management services. It is not possible to create additional management networks at the remote site. Virtual machine backups at the site will be dependent on the vCenter Server being available.

Which design decision should the architect make to maximize availability for backups?

2. An architect is designing the expansion of an existing vSphere 7 environment. The customer is requesting a design for a new cluster to support the anticipated future business

growth. The requirements specified for the existing environment design must be considered when designing the new cluster.

The existing design has the following requirements:

✑ REQ01 The environment has an availability target of 99.5% for all infrastructure.

✑ REQ02 The recovery time objective (RTO) for Tier 1 virtual machines is one hour.

✑ REQ03 Windows and Linux virtual machines must reside on separate clusters.

✑ REQ04 Access to the management cluster within the environment must be controlled.

Which of the listed requirements would be classified as a functional requirement?

3. An architect is considering placement of virtual machines within an existing VMware software-defined data center (SDDC).

During the discovery phase, the following information is documented:

Cluster One

✑ Six ESXi hosts

✑ vSphere HA with host failures cluster tolerates = 1

✑ Proactive HA is enabled and set to automated

✑ Fully Automated vSphere DRS

✑ Transparent Page Sharing (TPS) is enabled

Cluster Two

✑ Eight ESXi hosts

✑ vSphere HA with host failures cluster tolerates = 1

✑ Proactive HA is disabled

✑ Partially Automated vSphere DRS

✑ Transparent Page Sharing (TPS) is disabled

Cluster Three

✑ Three ESXi hosts

✑ vSphere HA with admission control is disabled

✑ Proactive HA is not supported

✑ Transparent Page Sharing (TPS) is disabled

Virtual Machine Resource Profile 1

✑ Memory sharing techniques should not be used

✑ Virtual machines should be automatically restarted in the event of host failure if resources are available

✑ Automated initial virtual machine placement

Virtual Machine Resource Profile 2

✑ Memory sharing techniques should not be used

✑ Virtual machines should be automatically restarted in the event of host failure regardless of available resources

✑ Automated initial virtual machine placement

Which two recommendations should the architect make for placement of the virtual machines to meet resource profile requirements? (Choose two.)

4. An architect is tasked with designing a greenfield VMware software-defined data center (SDDC) solution that will be used to deliver a private cloud service for a customer.

During the initial meeting with the service owner and business sponsor, the customer has provided the following information to help inform the design:

✑ The solution must support the concurrent running of 1,000 virtual machines

✑ The production environment must be delivered across two geographically dispersed data centers All virtual machines must be capable of running in either data center.

✑ The two data centers are currently connected to each other through a single but diversely routed, high bandwidth and low latency link.

✑ The link between the two data centers is capable of supporting a round-trip time (RTT) of 150 ms The existing server hardware standard document states that all virtual infrastructure hosts must be deployed using vSAN ReadyNodes

✑ The service owner has stated that it is critical to ensure the availability target of 99.9% All virtual machine backups must be completed using the existing backup service

✑ The recovery time objective (RTO) for the service is five minutes

✑ The recovery point objective (RPO) of the service is four hours

Which two elements represent risks to the successful delivery of this solution? (Choose two.)

5. During a transformation project kick-off meeting, an architect highlights specific areas on which to focus while developing the new conceptual design.

Which two of the listed statements are business requirements? (Choose two.)

6. Application owners require support of a Microsoft Windows Server Failover Cluster (WSFC).

Their current environment consists of the following components:

✑ vSphere 7.0 and vSAN 7.0

✑ External array supporting NFS 3.0/4.1, Server Message Block (SMB) 2.1

✑ 10 GbE storage connectivity for all devices

The solution architect is tasked with coming up with a solution to meet this requirement while utilizing their existing investments.

Which two recommendations could the architect make? (Choose two.)

7. As part of a new hybrid cloud initiative for a large financial company, the customer technical

team is presenting an overview of the current state of the infrastructure and their vision for a new solution.

The project team captures notes during the presentation and adds them to the discovery documentation .

Which of the listed statements is a design constraint?

8. There is a request for approved virtual machine applications through a new vSphere platform’s integrated automation portal. The platform was built following all provided company security guidelines and has been assessed against Sarbanes-Oxley Act of 2002 (SOX) regulations.

The platform has the following characteristics:

✑ vRealize Operations is being used to monitor all clusters.

✑ There is a dedicated ESXi cluster, supporting all management services. There is a dedicated ESXi cluster for all line-of-business applications.

✑ Network traffic is serviced by NSX-T.

There is a dedicated ESXi cluster for virtual desktop infrastructure (VDI).

✑ Network traffic is serviced by NSX-T.

The application owner is requesting approval to install a new service that must be protected as per the Payment Card Industry (PCI) Data Security Standard.

Which additional non-functional requirement should the architect include in the design to support the new service?

9. An architect is designing a new VMware software-defined data center (SDDC) that will consist of 100 branch sites connected to a single VMware vCenter Server within the primary data center. To allow for the use of existing automation scripts, there is a requirement to replicate the names of the virtual distributed port groups across all sites. The procurement team purchases licensing and there is no further budget allocated.

Which design decision should the architect make to meet this requirement?

10. A customer requires the use of data encryption to ensure data is not accessible when a drive is removed from the primary storage platform. However, there is also a requirement to use deduplication and compression against all workloads in order to conserve space.

Which solution meets the customer requirements?


 