H35-511-ENU Dumps Guarantee You Pass H35-511-ENU Exam Easily

Category:

Comments:

Post Date:


As new threats and vulnerabilities emerge, the H35-511-ENU exam is updated to reflect the latest trends in HCNP. By using H35-511-ENU exam dumps questions, you can ensure that you're staying up-to-date with the latest exam content and are fully prepared to address new challenges in Huawei Certified Network Professional-GSM RNP&RNO. Huawei H35-511-ENU exam dumps questions can help you optimize your preparation and ensure that you're fully prepared for the exam. Practice free Huawei H35-511-ENU exam dumps questions below.

Page 1 of 7

1. A serious uplink interference problem occurred in a certain network. Before checking the interfering cells, first turn off downlink power control for all cells and send idle bursts on all carrier frequencies. It is found that the interference bands in the traffic statistics of several cells have increased significantly, and some even appear at level 5.

What is the possible reason for this phenomenon?

2. Which of the following statements about dBi, dBd, dBc are wrong? (Multiple choice)

3. In the GSM system, after the mobile phone receives a paging message on the PCH channel, which of the following channels should it send CHANNEL REQUEST to request access?

4. Which of the following switching is an emergency switching? (Multiple choice)

5. The penetration rate of mobile users is not related to which of the following factors?

6. The noise introduced by the repeater system is related to the noise figure of the equipment, and has nothing to do with the gain.

7. Increasing the number of frames in the same paging code can improve paging overload.

8. Assume that the usable frequency bandwidth is 6MHz, BCCH is multiplexed in 4x3, and there are 14 in total.

And TCH adopts 1x3 multiplexing, which of the following statements are correct? (Multiple choices)

9. In the frequency planning of a certain place, in addition to the main BCCH frequency point, a 6M frequency band is allocated for TCH, and 1x3 frequency hopping is adopted. In order to ensure that the same adjacent frequency collision does not occur in the same base station, what is the maximum station configuration?

10. The BSC received a location update rejection, which is the reason for the impossibility? (Multiple choice)


 

TAGS:

Subscribe
Notify of
guest
0 Comments
Oldest
Newest Most Voted
Inline Feedbacks
View all comments

Related

Posts